BioGas Plant

2017-09-18T19:53:36+01:00

Drummond Enterprises were enlisted by Williams Industrial services to support the Mechanical and Electrical fit out at the Buchan BioGas Plant. Taken on-board from initial construction and remaining on the project through to commissioning and subsequent handover of the plant. We had a team of 18 Electrical and Mechanical Technicians, carrying out various tasks from cable pulling, terminating and testing on the electrical front through to pipework and pump installation along with leak testing on the mechanical side.

Following the completion of the final stages of commissioning this year, 660m3 of renewable gas (i.e. biomethane) will be produced hourly and injected into the national gas grid, the equivalent of 57,000,000 kWh annually, sufficient to meet the heat demand of 3,500 homes in the Peterhead region. This displaces fossil fuel natural gas with a sustainable alternative.

Peterhead BioGas Plant

I&L Burnett farm store

2017-09-15T18:29:51+01:00

This was a large installation for a farm store. Our work here consisted of full design, installation and commissioning of a 3 phase installation. For this we had drawings produced to allow our client to identify exactly what they wanted this then allowed our engineers to follow a pre-determined scope of works. The installation consisted of a sub-main from existing shed, cable tray works, 3 phase circuits, 230v sockets and a 110v circuit for power tools. In addition to this there was a 50KW heater to be installed with speed and temperature control.

SkeneShed